Textile Notes

Textile blog on Textile, Clothing and Fashion Resource

Textile Notes

Textile blog on Textile, Clothing and Fashion Resource

List of Documents Required for Technical Audit in Garments Industry

The Technical Audit covers documents, analysis, testing, and checking. For all these activities, the auditor needs to check a lot of documents. The audit will consist of an on-site factory tour (warehouse & all the production areas), document review, and interviews. Please make sure all production processes are running and related managers/supervisors are available during audit day. You need to provide the related evidence or document to the auditor when conducting the audit. This article is presenting details on the List of Documents Required for Technical Audit in the Garments Industry.

The Auditor will check on the standard operating procedures, execution of operating procedures, inspection procedures, inspection checklist, and defect analysis during the audit. The Auditor will need to follow the Audit Schedule Plan to cover all the areas’.

The number of production lines, number of direct and indirect employees, production capacity, efficiency, first-time pass rate, rejection rate, cut-to-ship ratio, and labor cost savings will be verified onsite during the audit compared with the data from the pre-audit questions provided by the factory.

The auditor will record non-conformities observed during the audit along with his comments during the audit and after completion, the non-conformities will be reviewed with supplier during closing meeting.  The auditor will also double-check during the course of the audit if the data collection found onsite is reliable and robust compared to the data provided in the pre-audit KPI summary.  The supplier signs off the audit documents as acceptance of the audit findings and non-compliances observed during the audit. List of Documents Required for Technical Audit in Garments Industry below:

List of Documents Required for Technical Audit in Garments Industry

List of Documents Required for Technical Audit in Garments Industry

  1. Business License.
  2. Organization Chart – Please supply prior to audit with Factory Profile.       
  3. 3rd Party Certificates ie ISO9000 / 14000, SA8000, HACCP, BRC etc.ISO9000 / 14000, SA8000, HACCP, BRC
  4. Process Flow Diagram – Please supply prior to audit with Factory Profile.   
  5. Machinery List– Please supply prior to audit with Factory Profile.   
  6. Machine Maintenance Plan & Records        
  7. Quality Policy – Please supply prior to audit with Factory Profile.    
  8. Quality Objective       
  9. Quality Manual– Please supply prior to audit with Factory Profile.  
  10. Hazard and Risk Assessment System (HRAS) and Record    
  11. Management Review Procedure and Record 
  12. Internal Audit Plan & Records          
  13. Training records including work skill GMP & personal hygiene
  14. Legal   Statutes  and  Mandatory  Standards Applicable to Products/ Materials
  15. Personal hygiene standards
  16. Specifications for Incoming Materials and Final Products
  17. Products Change Records
  18. Suppliers / Sub-contractor Control Procedure and Assessment Record
  19. Customer Complaint Procedure and Record
  20. Measuring / Testing Equipment List
  21. Measuring Equipment Calibration Certificate and Records
  22. Master Reference Standards Calibration Certificate
  23. Internal Calibration Procedure and Record,
  24. Internal Calibration Staff Qualified Certification
  25. Quality control Instructions/ Inspection records (Incoming Materials/ Sub-contracting Product
  26. Inspection, In-process Inspection & Finished product inspection Instructions
  27. Production Plan         
  28. Job Description of all sections responsible
  29. Packaging Instructions
  30. Sharp Tools Control Procedure, Sharp Tools, Losing Investigation Procedure (If applicable)          
  31. Daily Issuance & Return of Sharp Tools Records (If applicable)       
  32. Broken Needle Policy/ Record (If applicable)
  33. Glass, brittle and hard plastic control procedure and relevant register list and control record         
  34. Procedure for the effective operation, routine monitoring, testing and calibration of metal
  35. detector and relevant control record (If applicable)   
  36. Non-conforming Material Control Procedure
  37. Corrective & Preventive Actions Procedure/ Records
  38. Documents Control Procedure
  39. Product Design and Development Control
  40. Procedure and Related Records         
  41. Cleaning Procedure and Cleaning Records    
  42. Temperature and Humidity
  43. Documents Control Procedure/Records 
  44. Pre-Production Meeting Reports       
  45. Pilot Runs Records    
  46. Test Procedure & Report for Raw Material, 
  47. Packaging Material, WIPs, and Finished Product      
  48. Including Chemical tests, Safety Test,
  49. Life/Reliability Test, Function Test    
  50. Waste Handling Control Procedure   
  51. Pest Control Procedure and Relevant Record.
  52. Product Identification and Traceability System; Annual Mock Traceability Record
  53. Incoming and Outgoing Records of Materials and Products
  54. Procedure document of New vendor qualification & Existing vendor performance evaluation
  55. Training plan & records (for factory employees & Management).

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to top