Spinning Production Calculation Formulas
Spinning Production Calculation Formulas
Spinning is the process of manufacturing yarn from fiber during ring yarn manufacturing various machines are involved in the production namely Blow room, Carding, Comber, Draw frame, Speed Frame, and Ring frame. Calculations play a very crucial role during the yarn. In this article, we are discussing Spinning Production Calculation Formulas.
Some important spinning production calculations are mentioned in the following article which can be useful during the ring-spinning process, especially about spinning production formula, and draft calculation in spinning. Those formulas are very important in every step of the yarn manufacturing factory.

All the Spinning Production Calculation Formulas
Blow Room Production Calculations Formulae:
1. Cleaning efficiency % = Trash in mixing – Trash in lap * 100
Trash in mixing
2.Beater wise waste % = Beater wise waste collected in kgs
Total input for the particular beater in kgs * 100
3. Total blow room waste % = Total waste collected in kgs 100
Total input in
4. Beater wise trash % = Beater waste % Trash % in waste
100
5. Beats / inch = Beater rpm * No. of arms____________
Feed roller rpm *3.14 * feed roller dia (inch)
6. Weight of lap = lap length (Kg)
840 * Hank * 2.204
7. Production / scutcher/ 8 hrs = Weight /lap (kg)* 60 * 8 (kg)
Time (in minutes)
8. Draft of a scutcher = Surface speed of fluted lap roller
Surface speed of Regulating roller
9. % Waste = Loss in weight____
Weight of material fed
Carding Production Calculations Formulae:
1. Draft = Hank sliver delivered
Hank of lap fed
2. TPI = Rpm of can plate
Surface speed of calendar roller
3. Production / card / 8 hrs (kg)
= _Doffer dia (inch)* 3.14 * Doffer speed * 8 * 60 (Kg)
36 * Hank sliver delivered * 840 * 2.204
(OR)
= Surface speed of Doffer(inch/min) *60*8*Tension draft
36 * 840 * Hank of sliver * 2.204
4.Side shaft change bevel = Draft constant______
Calculated draft required
5. Nep count = Neps / 100 square inches of card web
6. Nep /2 grains = Standard Nep count
2.41
where,
Std. Nep count = Nep/100 sq. inch* Hk. sliver* width of card
0.12 * 40
7. Surface speed Ratio :
Cylinder to licker-in = 2.0 to 2.3(fine count)
Cylinder to Doffer = 25 to 30 (fine count)
- Cleaning efficiency(%)=Trash in lap – Trash in sliver*100
Trash in lap
9. Draft constant = Draft * Draft wheel
10. Card Doffer speed = Cylinder dia in inches * 0.036 cyl.rpm
Doffer dia in inches *Staple length
11. Avg. capacity of card sliver can(Net wt in lb.) = F * D2 * M
Where, F = 0.002557 (for card sliver)
= 0.002756 (for drawing sliver)
D = Dia in inches
H = Height in inches
12. Carding index(K) = nf
vg
Where, n = Cylinder rpm
f = Surface speed of cylinder in meters
v = Licker-in speed in mpm
g = Weight of one Mt. of lap in gms.
13. Lickerin speed = Production in lb./hr * 116.66
2.75
14. Actual draft = Mechanical draft * 100
- waste %
Comber Production Calculations Formula:
1. NIPS/MINFEED/NIPGRAINS/YARD160100-W%11NO OF HEADS
36 100 7000 2.204
2.PRODN/HR = 36.8TOTALDRAFTNIPS/MIN2(NO OF DELIVERYS)EFF
MAINDRAFT HANK OF SLIVER 2.204
- PRODN/8 HR = FEED/NIP6081.0936NO OF HEADS100-NOILEFF
1000840100LAP HANK2.204
4.PRODN/8 HR = LAP WT IN GMS/MTR1-NOIL%NIPS/MIN480
100
7 FEED CHANGE GEAR
5.PRODN/8 HR = FEED/NIPNIP/MINGMS/MTR480NOOF HEADS(100-NOIL) EFF
10001000100
6.PRODN/8 HR = COILER CALENDER ROLLER SURFACE SPEED4802(100-NOILEFF
1000SLIVER HANK 100
0.00059
6. Comber fractionating index = Short fibre % in cbr sliver *100
Short fibre % in sliver lap
7. Production in kg
= Nips* feed/nip(mm)*Lap wt(gms/mt)*100-noil%*60*8*No.of Dblgs
Min 1000 1000 100
(OR)
= 0.0384 * LSF * (100- waste %)
1000
Where, L = Lap weight in gm/meter
F = Feed in mm / min
S = Speed in nips / min
W = noil extracted in %
8.Nips/min = Motor rpm * motor pulley__ * 0.2028
machine pulley
9.Feed/nip = * D
S
Where, D = Feed roller dia ( = 25mm )
S = Ratchet feed ( S= 16 )
10. % of noil = Mass of noil______________* 100
Mass of noil + Mass of Combed Sliver
11.Combing Efficiency
=(50% span length Cbd sliver – 50% Span length Cbd lap) * 100
50% span length of comber lap * % of waste extraction
Rating CE% ( for 13-18 % noil )
Good 1.0
poor 0.6
12.Nep removal efficiency
= Neps/100mg in cbr lap – Neps/100mg in Cbr sliver * 100
Neps / 100 mg in comber lap
Draw Frame Production Calculations Formulae:
1.Front roller speed = motor speedDia of motor pulley
Dia of front roller pulley
2.PRODUCTION IN LBS = DN608
36840COUNT
3.Production in kg = FR surface speed(mpm)* 1.0936 * 60* 8* Effy
840 * count * 2.204
4. Drawing can weight in kg = 1.5 * Height * (Diameter)2
1000
Where, Dia & Height in inches only
5.Draft constant = Draft * Draft wheel
6.Draft change wheel Reqd. = Present Draft wheel * Present Hank
Required Hank
7. Hank Delivered = Draft at drawing * Hank fed
No. of doublings
8.Hanks to Kgs = Hanks * 0.4536 per delivery
Count
______________________________
Speed Frame Production Calculations Formulae:
1. PRODUCTION PER SHIFT OF 8 HOURS IN KGS WITH 100% EFFICIENCY:
FRONT ROLLER DELIVERY(INCHES/MINUTE) x 60 x 8 x 120
= —————————————————
36 x 840 x HANK x 2.204
2. TWIST PER INCH = SPINDLE SPEED(RPM)
———————————
FRONT ROLLER DELILVERY(INCHES/MIN)
3. TWIST MULTIPLIER = TPI
——————
(HANK OR COUNT)1/2
4. PRODUCTION/SPINDLE/PER SHIFT OF 8 HOURS IN KGS AT 100% EFFICIENCY
= 1 x FRONT ROLLER DELIVERY(INCH/MIN)
———————————–
63 x COUNT
5. GRAMS/SPINDLE/SHIFT OF 8 HOURS
= SPINDLE SPEED x 7.2 x EFFICIENCY
——————————–
TPI x ROVING HANK
6. EXPECTED HANKS PER SHIFT OF 8 HOURS
= FRONT ROLLER DELIVERY(INCH/MIN) x 8 x 60 x EFFICIENCY
—————————————————–
36 x 840
7. EFFICIENCY = ACTUAL PRODUCTION
——————— x 100
PRODUCTION(CALCULATED)
8. FRONT ROLLER SPEED = 1440 x 160/230 x 102/63(Wz) x 28(g)/74(h)
x 27(K)/67 x 27 x 3.14/1000
= 17.049meters per minute.
Ring Frame Production Calculations Formulae:
1. Production / spl/ 8 hrs = π D N * 8 *60* Effy
TPI * Count * 100
2. Production / spl / hr in kg = Spl. Speed (Rpm) * 60 * Effy_
TPI * 36 * 840 * Count * 2.204
3. Required Ratchet wheel = Present wheel * Reqd. count
Present count
4. Traveller speed (rpm) = Spl speed( rpm)- Wdg on speed (rpm)
Where, Winding on speed = Roller Delivery (rpm)
Bobbin circumference
5. Spindle speed = Tin roller (rpm) * Dia of tin roller
Dia of spl Wharve
6. Traveller speed (ft/sec) = Spl speed * 3.14 * Ring dia(inch)
60*12
7. Twist contraction % = 2.64 TM – 4.82
That all on the Spinning Production Calculation Formulas.
Where, TM = Twist Multiplier
- Written by: Mr.Yash Trivedi
- VJTI, Mumbai-19
- Email: [email protected]