Textile Notes

Textile blog on Textile, Clothing and Fashion Resource

Textile Notes

Textile blog on Textile, Clothing and Fashion Resource

Flow Chart of Quality Control in Garments Manufacturing

Export Garments Quality control is not an easy task for garment manufacturers. Export garment quality should be high, there is a standard for the product. To keep the export garment quality standard, certain quality control requirements have to be fulfilled in every process of garment manufacturing. Quality control is done by this department, the QC team is assigned throughout the whole manufacturing process of Garments industry. Quality should be everyone’s priority in garment manufacturing. Here is the Flow Chart of Quality Control in Garments Manufacturing below:

The process flow chart of quality control in the garment manufacturing starts with the Fabrics and trims inspection, then the cutting inspection, sewing, and followed by finishing. After the finishing process, finished garments are ready for the Final quality inspection process. Every process is being quality inspected in the garment industry, the purpose is to get garments that meet customer satisfaction.

Flow Chart of Quality Control in Garments Manufacturing

Flow chart of Quality Control in Garments Manufacturing
Fabrics and Trims in-house

Fabrics and Trims inspection

QC file /Trim card received


Size set cutting

Size set sample making

PP Meeting

Pattern correction/adjustment

A pilot run cutting(If needed
)

Pattern correction(If need)

Pilot run approval

Start Bulk cutting approval

Fabric relaxation

Spreading

Spreading Quality control

Receive marker from CAD

Marker checking and report

Pattern collection

Pattern checking(Measurement and Grainline)

Cutting process

Cutting Quality control→(Cutting defects)

Cut Panel inspection

Sewing Quality control

Front part Inspection

Back Part Inspection

Assembly Inspection

Output Quality Inspection

Garments measurement

Quality Audit following the AQL chart

Sending goods for washing

Washing process

Shade segregation

Shade inspection

Finishing

Trimming

Trimming QC check

Buttoning

Buttoning QC check

Button pull test

Ironing

Garments Inspection

Get up inspection

AQL 2.5 Quality Audit

Attach Hangtag, UPC, sticker, and other ticketing

Quality Checking sticker and ticketing

Folding

Garments pass through the needle detector machine

Packing/Cartooning

Final Inspection Request to Buyer

Making a Packing List

Submit the Packing List to the buyer

Final Quality Inspection Process

Pass→Fail →Recheck→ Re-audit

Finished Goods warehouse

Shipment

Calibrate Quality control and other related equipment yearly or half-yearly, like fusing machine, Needle detector machine, Button pull test machine, Light box, etc, are also required for quality control. This comprehensive Flow Chart of Quality Control in garments manufacturing presents step-by-step QC checks in the garment industry.

Leave a Reply

Scroll to top