Consumption formula

Thread consumption formula

Sewing thread per garment from each seam length and the measured thread-to-seam ratio of its stitch type, plus wastage.

Formula
T=∑(Si×ri)100(1+w100)T = \dfrac{\sum (S_i \times r_i)}{100}\left(1 + \dfrac{w}{100}\right)

Thread per garment (m) = Σ(seam length (cm) × ratio) / 100 × (1 + wastage / 100)

SymbolMeaningUnit
S_iSeam length for stitch type icm
r_iThread used per cm of seam for that stitch typecm/cm
wWastage allowance%

When to use it

Use it to order thread by color and ticket for an order, and to cost thread accurately in the BOM.

Worked example#

Side seams and shoulders, 150 cm of four-thread overlock at a measured ratio of 18; hems, 190 cm of coverstitch at 16; label, 10 cm of lockstitch at 2.5. Wastage 12%.

  • Overlock: 150 × 18 = 2,700 cm
  • Coverstitch: 190 × 16 = 3,040 cm
  • Lockstitch: 10 × 2.5 = 25 cm
  • Net = 5,765 cm = 57.65 m; with 12% = 64.6 m per garment

Measuring a ratio#

Sew 10 cm of seam on the production fabric at the production SPI, unpick all threads of that stitch, measure them straightened and divide by 10.

Where this formula is explained

Was this useful?