Fabric & consumption calculator

Fabric GSM Calculator

Calculate fabric GSM from a round cutter or any rectangular sample, or estimate it from woven construction (EPI, PPI, counts, crimp) or single jersey loop geometry.

Inputs

Method

Weigh the conditioned sample on a balance reading to at least 0.01 g.

cm²

Most GSM round cutters cut exactly 100 cm². Check the marking on your cutter.

Result

Fabric GSM

180g/m²

Weight in oz/yd²
5.31oz/yd²
Sample area
100cm²
Equivalent 100 cm² cutter weight
1.8g

Compare against the ordered GSM and the tolerance agreed with the buyer. Many buyers work to a plus or minus 5% tolerance, but always use the figure in your specification.

Working
  1. Sample weight = 1.8 g
  2. Sample area = 100 cm² = 0.01 m²
  3. GSM = 1.8 / 0.01 = 180 g/m²

Formulas

Measured GSM
GSM=WA×10 000\text{GSM} = \dfrac{W}{A} \times 10\,000

GSM = W / A × 10,000

SymbolMeaningUnit
WSample weightg
ASample areacm²
Woven estimate
GSM≈39.37 [EPI(1+C1) T1+PPI(1+C2) T2]1000\text{GSM} \approx \dfrac{39.37\,[\text{EPI}(1+C_1)\,T_1 + \text{PPI}(1+C_2)\,T_2]}{1000}

GSM ≈ 39.37 × [EPI × (1 + C1) × T1 + PPI × (1 + C2) × T2] / 1000

SymbolMeaningUnit
EPI, PPIEnds and picks per inchthreads/in
C₁, C₂Warp and weft crimp as a fraction-
T₁, T₂Warp and weft linear densitytex (g/km)
Knit estimate (single jersey)
GSM≈CPI×WPI×1550×ℓ×T106\text{GSM} \approx \dfrac{\text{CPI} \times \text{WPI} \times 1550 \times \ell \times T}{10^{6}}

GSM ≈ CPI × WPI × 1550 × ℓ × T / 1,000,000

SymbolMeaningUnit
CPI, WPICourses and wales per inchper in
ℓStitch lengthmm
TYarn linear densitytex
1550Square inches per square meter (39.37²)in²/m²

How the calculator works#

Choose one of four methods:

  • Round cutter: enter the sample weight and the cutter area. Most cutters cut 100 cm², so GSM is simply the weight multiplied by 100.
  • Rectangle: enter the weight and the length and width of any rectangular sample, in centimeters or inches.
  • Woven estimate: enter ends and picks per inch, warp and weft counts in Ne, tex, Nm or denier, and the crimp of each. The calculator converts each count to tex and adds the warp and weft weights.
  • Knit estimate: enter courses and wales per inch on relaxed fabric, the stitch length and the yarn count.

Every result also shows the weight in oz/yd² and the full working, so you can check the arithmetic or paste it into a report.

Worked example#

A quality checker cuts five samples with a 100 cm² cutter from a finished 180 GSM order. The average weight is 1.84 g.

GSM = 1.84 × 100 = 184 g/m², which is 2.2% above the 180 target and inside a plus or minus 5% tolerance.

Interpreting the result#

Compare the result with the target and tolerance in your fabric specification, and record the fabric state (grey, finished or after wash). If a construction estimate and a measured GSM disagree by more than a few percent, check yarn count, stitch length or picks, and the finishing width. A fabric pulled wide on the stenter reads light and often shrinks later.

Assumptions

  • The measured method is the reference. Construction methods are estimates for planning and cross-checking.
  • Samples should be conditioned in a standard atmosphere before weighing, because moisture changes weight.
  • The woven estimate ignores size, finish add-on and weight changes from dyeing and finishing.
  • The knit estimate assumes one loop per course per wale (single jersey type). Rib, interlock and fleece need the measured method.

Common errors

  • Cutting samples near the selvedge or from a creased area, which gives an unrepresentative weight.
  • Using a blunt cutter that frays the edge and loses fibre from the sample.
  • Weighing a single sample. Take at least three to five across the width and average them.
  • Mixing Ne and tex, or entering picks per cm as PPI.

Questions

How many samples should I weigh for GSM?

At least three, taken across the width and away from the selvedge, and preferably five. Report the average and the range; a large range tells you the fabric is uneven.

Why does my lab GSM differ from the construction estimate?

Construction estimates do not include finishing effects such as compaction, stretching on the stenter, brushing, chemical add-on or moisture. Use the estimate for planning and the cut sample for acceptance.

Can I use the knit estimate for rib or interlock?

No. The knit method assumes one loop per course per wale, which fits single jersey structures. Double-knit fabrics have loops on two needle beds, so weigh a cut sample instead.

Related formulas

Guides for this calculation

Was this useful?