Quality & DefectsIntermediate

Final Inspection of Garments: How a Pre-Shipment Inspection Works

A final (pre-shipment) inspection checks a finished, packed lot against the buyer's requirements before it ships. What is checked, how samples are drawn, the order of work, and how to prepare so the lot passes the first time.

By Published 3 min read
On this page

A final inspection, often called a pre-shipment inspection, is carried out on finished and packed goods before they leave the factory. It is usually done by the buyer's quality team or a third-party inspection company, using an AQL sampling plan. The goal is to confirm that the lot meets the buyer's requirements.

When it happens#

Most buyers require that the lot is 100% produced and at least 80% packed before final inspection starts. Check the buyer's manual: some require 100% packed. Inspecting before the lot is ready usually leads to a failed or cancelled inspection.

What is checked#

Area Typical checks
Quantity Produced and packed quantity by style, color and size against the order
Packing Carton marks, dimensions and weight, assortment, polybags, folding, hangtags, barcodes
Workmanship Visual defects on the sampled garments, classified critical, major and minor
Measurements Key points of measure on a sample per size, against the spec and tolerance
Style and color Style details, color and shade against the approved sample
Labels and trims Care labels, size labels, country of origin, trims, accessories
On-site tests Examples: carton drop, seam slippage pull test, barcode scan, color fastness to rubbing, needle detection (as the buyer specifies)

The order of work#

  1. Readiness check: confirm quantities, packing progress, documents and approved samples.
  2. Carton selection: the inspector selects cartons at random from across the lot. The number of cartons is often the square root of the total, rounded up, but follow the buyer's method.
  3. Packing and assortment check on the opened cartons.
  4. Sample draw: garments are taken from the selected cartons across sizes and colors to the AQL sample size.
  5. Workmanship inspection: each sampled garment is checked in a set order, inside and out.
  6. Measurements on the required number of pieces per size.
  7. On-site tests as specified.
  8. Result: defect counts compared with the accept and reject numbers. See AQL.
  9. Report signed by the inspector and factory representative.

Preparing to pass#

  • Do your own final audit first, using the same AQL plan and defect definitions.
  • Keep an approved sample, trim card and measurement spec at the inspection area.
  • Provide a good inspection table: clean, well lit, with a measuring tape and a light box or daylight lamp where needed.
  • Have packing lists ready, with carton numbers.
  • Separate the lot from other orders so cartons are easy to reach.
  • Fix known problems before offering the lot; do not hope the sample misses them.

When a lot fails#

A failed lot is usually sorted (100% inspection of the affected defect type), repaired or replaced, and offered for re-inspection. Record the cause and fix the process. Repeated failures point to problems that inline controls should have caught. See inline inspection and root cause analysis.

Common reasons for failure#

  • Measurement out of tolerance on one or more sizes. See measurement variation.
  • Shade variation between garments in a carton. See shade variation.
  • Stains, loose threads and untrimmed ends.
  • Wrong or missing labels, hangtags or barcodes.
  • Wrong assortment or carton marks.

Record results with the AQL inspection sheet.

Was this useful?

Tools for this topic

Related defects

Related technical notes