Costing calculator

CM Cost Calculator

Calculate cost of making (CM) per piece and per dozen from garment SMV, cost per minute and expected efficiency, or derive cost per minute from monthly manufacturing cost.

Method note: Which costs are included in CPM is a company decision. Keep the definition fixed across quotations.

Inputs

Cost per minute

min
%
%

Result

CM per dozen

19.2USD

CM per piece
1.6USD
Cost per minute used
0.08USD/min
Working
  1. CM per piece = 12 × 0.08 / 0.6 = 1.6 USD
  2. CM per dozen = 1.6 × 12 = 19.2 USD

Formulas

Formula
CMpc=SMV×CPMη\text{CM}_{pc} = \dfrac{\text{SMV} \times \text{CPM}}{\eta}

CM per piece = SMV × cost per minute / efficiency

SymbolMeaningUnit
CPMCost per available minutecurrency/min
ηExpected line efficiency as a fraction-
Cost per minute
CPM=CmonthN×T×D\text{CPM} = \dfrac{C_{month}}{N \times T \times D}

CPM = monthly cost / (operators × minutes per day × working days)

SymbolMeaningUnit
C_monthMonthly manufacturing costcurrency

How the calculator works#

CM per piece = SMV × cost per minute / efficiency. CM per dozen = CM per piece × 12. An optional margin can be added on CM.

If you do not know your cost per minute, choose "Derive from monthly cost": cost per minute = monthly cost / (operators × minutes per day × working days).

See CM cost for the method and its assumptions.

Worked example#

Defaults: SMV 12, cost per minute 0.08 USD, expected efficiency 60%.

  • CM per piece = 12 × 0.08 / 0.60 = 1.60 USD
  • CM per dozen = 1.60 × 12 = 19.20 USD

With derived cost per minute, a monthly cost of 250,000 for 600 operators working 480 minutes on 26 days gives 250,000 / 7,488,000 = about 0.0334 per minute.

Interpreting the result#

CM depends heavily on the efficiency you assume. Use the efficiency your lines actually achieve for similar styles. Add CM to fabric, trims and other costs with the garment costing calculator.

Assumptions

  • CPM here is based on available minutes. Dividing by efficiency converts it to cost per produced (earned) minute.

Common errors

  • Using a CPM already based on produced minutes and then dividing by efficiency again.
  • Quoting CM at a first-week efficiency for a long running style, or at running efficiency for a short order.

Questions

Why divide by efficiency?

Cost per minute is the cost of an available minute. A line at 60% efficiency needs about 1.67 available minutes for each standard minute of work, so the SMV is divided by efficiency.

What should the monthly cost include?

The manufacturing costs you allocate to sewing: wages, salaries, utilities, rent, depreciation and overheads. Be consistent with how you define cost per minute.

Related formulas

Guides for this calculation

Was this useful?