Industrial engineering calculator

Garment SMV Calculator

Build a garment SMV from observed operation times: enter each operation's observed time in seconds and performance rating, add an allowance, and get basic time, SMV per operation and total garment SMV.

Method note: Rating scales and allowance policies differ between companies and predetermined time systems.

Inputs

Operations

Observed time is the average of your valid time study cycles for that operation, in seconds.

%

Allowance policy is set by your IE department. Machine and manual work may carry different allowances.

Result

Garment SMV

4.853min

Total basic time
4.22min
Operations
8
Pieces per hour at 100% (one operator)
12.4pcs
Working
  1. Basic time = Σ(observed / 60 × rating) = 4.22 min
  2. SMV = 4.22 × (1 + 15 / 100) = 4.853 min
Operation breakdown
OperationBasic time (min)SMV (min)
Shoulder join (overlock)0.3480.401
Neck rib join0.50.575
Neck top stitch0.390.448
Sleeve attach0.80.92
Side seam close0.911.047
Sleeve hem0.5380.619
Bottom hem0.50.575
Care label attach0.2330.268

Formulas

Formula
SMVop=tobs60×R100×(1+A100)\text{SMV}_{op} = \dfrac{t_{obs}}{60} \times \dfrac{R}{100} \times \left(1 + \dfrac{A}{100}\right)

Operation SMV = observed seconds / 60 × rating / 100 × (1 + allowance / 100)

SymbolMeaningUnit
t_obsAverage observed cycle times
RPerformance rating (100 = standard pace)%
APersonal, fatigue and delay allowance%
Garment SMV
SMVgarment=∑SMVop\text{SMV}_{garment} = \sum \text{SMV}_{op}

Garment SMV = sum of all operation SMVs

How the calculator works#

For each operation, basic time = observed time (converted to minutes) × rating / 100. The calculator adds the basic times, then applies the allowance: garment SMV = total basic time × (1 + allowance / 100). A table shows the basic time and SMV for each operation.

See SMV calculation and time study for the full method.

Worked example#

The default operation list is a basic T-shirt with eight operations and a 15% allowance. For example, sleeve attach is observed at 48 seconds and rated 100: basic time = 48 / 60 × 1.00 = 0.800 min, and SMV = 0.800 × 1.15 = 0.920 min.

For the whole garment:

  • Total basic time = 4.220 min
  • Garment SMV = 4.22 × 1.15 = 4.853 min

Interpreting the result#

The garment SMV is the standard time for one garment by one operator at standard pace. Use it for line efficiency, production targets and CM cost. The per-operation SMVs feed line balancing. Record the method and conditions with the SMV, because a different method needs a new study.

Assumptions

  • Observed times are averages of normal cycles, with abnormal cycles (machine breakdown, repair) removed.
  • One allowance percentage is applied to all operations. Some IE systems apply separate machine and bundle allowances.

Common errors

  • Rating every operator at 100% without judging pace, which copies the operator speed into the standard.
  • Mixing seconds and minutes in the same column.
  • Leaving out manual operations such as trimming, bundle handling or pressing that are part of the line.

Questions

What rating should I enter?

The performance rating from your time study, where 100 is standard pace. A faster operator is rated above 100 and a slower one below 100.

What allowance percentage should I use?

Your factory's agreed allowance for personal needs, fatigue and small delays. Apply the same policy to every operation.

Can I enter SMVs from a predetermined time system instead?

Enter the SMV in seconds with a rating of 100 and an allowance of 0 if the values already include allowances.